10+ CONCRETE MIX RULES OF THUMB YOU SHOULD KNOW August 28, 2014 by Suryakanta Rules of Thumb on Concrete Mix Adding 4 liters of water to 1 cubic meter of freshly mixed concrete will: Increase slump about 25 mm Decrease compressive strength about 1.5 to 2.0 N/mm2 Increase shrinkage potential about 10% Waste as much as ¼ bag of cement If Freshly Mixed Concrete Temperature Increases 1 degree Celsius: About 4 liters of water per cubic meter maintains equal slump Air content decreases about 1% Compressive strength decreases about 1.0 to 1.5 N/mm2 If The Air Content of Freshly Mixed Concrete: Increases 1%, then compressive strength decreases about 5% Decreases 1%, then yield will decrease about 0.03 cubic meter per 1 cubic meter Decreases 1%, then slump decreases about 12.5 mm Decreases 1%, then durability decreases about 10% Concrete Mix Rules of Thumb Share this:EmailPrintMore
This is a helpful method to use concrete cutting with drill for beginners. These tips will save a time. Thanks for sharing the tips about fast cutting concrete. Reply
This is a helpful method to use concrete cutting with drill for beginners. These tips will save a time. Thanks for sharing the tips about fast cutting concrete.