HOW TO REDUCE SAMPLE OF FINE AGGREGATE USING MINIATURE STOCKPILE METHOD?

Miniature Stockpile Method The miniature stockpile method is used for reducing all samples of fine aggregates when the material is in damp or moist condition. If the sample to be split is dry, the material is required to be moistened before using this method. Procedure Place the original sample on a clean, dry plate or … Read more

HOW TO REDUCE AGGREGATE GROSS SAMPLE TO TEST SAMPLE USING MECHANICAL SPLITTER?

Sample Reduction Using Mechanical Splitter Use of a mechanical splitter is considered to be the best method to reduce the gross sample of aggregate. The mechanical splitter splits the sample into two halves as the material passes through the spaces between the bars in the splitter. The same number of each particle size goes into … Read more

HOW TO REDUCE GROSS AGGREGATE SAMPLE TO TEST SAMPLE BY QUARTERING OR CONING METHOD?

What is Quartering? The process of reducing a representative sample to a convenient size, or of dividing a sample into two or more smaller samples for testing, is called quartering. This is a non-mechanical method of reducing a sample. Steps or Procedure for Quartering Place the original sample in the center of a clean, dry, … Read more

HOW MUCH AGGREGATE SAMPLE SHOULD WE COLLECT?

The amount of aggregate sample to be collected is dependent on the maximum nominal size of aggregate. The quantity of aggregate sample should be of such amount, so that the required test can be performed to judge its quality. Sample of aggregate is collected using a sampling scoop. Collect a no of increments (at least … Read more

HOW TO COLLECT AGGREGATE SAMPLE FROM STOCKPILE?

Sampling is of equal importance to testing and a man collecting samples should use every precaution to obtain samples that will show the true nature and condition of the materials which they represent. Aggregate Sampling from Stockpile Using a front end-loader, dig into the stockpile and set aside small pile of 10 to 15 ton … Read more

WHAT TO CHECK BEFORE CASTING SLABS?

Checking of Concrete Slab Check all the concealed electric conduit work, junctions and electrical points, the positions of fan points, and MS boxes as per your electrical layout plan. Check the reinforcement and get an approval from your RCC consultant. Check the standby arrangements made for water in case of power failure. Consult your RCC … Read more

WHAT IS THE IMPORTANCE OF AIR VOID CONTENT IN BITUMINOUS PAVEMENTS?

Importance of Air Void in Flexible Pavement The air void content of bituminous materials is an important control parameter for the quality of bitumen being laid and compacted. If the air void content is too high, it allows for intrusion of air and water. Moreover, it also increases the rate of hardening of binders which … Read more

WHAT ARE THE DIFFERENCES IN FUNCTION BETWEEN ROADBASE AND BASECOURSE IN FLEXIBE CARRIAGEWAY?

Function of Road Base and Base Course Road base is the most important structural layer in bituminous pavement. It is designed to take up the function of distributing the traffic loads so as not to exceed the bearing capacity of subgrade. In addition, it helps to provide sufficient resistance to fatigue under cyclic loads and … Read more